01
WE SUCCESSFULLY COLLABORATED AND MANAGED BLASTING AND SLOPE STABILIZATION IN A PROJECT WITH HIGH ENVIRONMENTAL STANDARDS AND SAFETY MEASURES.
SKOURIES, HALKIDIKI
02
WE UNDERTOOK THE EXTRACTION FOR THE NEW NATIONAL ROADS WITH HIGH PRODUCTION REQUIREMENTS OF UP TO 3,000,000 M3/YEAR.
NEMEA – MEGALOPOLIS – TRIPOLI – KALAMATA & CORINTHOU – TRIPOLI – KALAMATA
03
WE EXECUTED HIGH-PRODUCTIVITY WORKS TO FACILITATE THE DELIVERY OF THE PROJECT THAT RESOLVES WATER SUPPLY AND FLOODING ISSUES AT LASITHIOU AREA.
APOSELEMIS DAM, CRETE
04
IT IS OUR LARGEST PROJECT IN TERMS OF EXTRACTION VOLUME AND DURATION (15 YEARS).
LANDFILL SITE, WESTERN ATTICA
05
WE EXECUTED CONTROLLED BLASTING NEXT TO AN ALUMINUM PRODUCTION AND A POWER GENERATION PLANT, WITHIN THE PROJECT'S TIMELINE.
NEW POWER GENERATION STATION, AGIOS NIKOLAOS – VIOTIA
06
WE CARRIED OUT HIGH-RISK CONTROLLED BLASTING NEXT TO THE HISTORIC "PINK VILLA."
SCORPIOS ISLAND, LEFKADA
07
WE PARTICIPATED IN REMOTE AND SPECIALIZED ENERGY PROJECTS.
WIND FARMS 82.25 MW, DESFINA
08
THE WASTEWATER TREATMENT PLANT IN KAVALA IS AN EXCELLENT EXAMPLE OF OUR ABILITY TO EXECUTE PROJECTS ON CHALLENGING TERRAIN. THE PLANT IS LOCATED ON A STEEP SLOPE WITH LIMITED SPACE AND ACCESS.
ASPRI AMMOS, KAVALA
09
THE ROAD CONNECTION PROJECT BETWEEN AKTIO AND LEFKADA. WE TOOK ON THEIR RESOLUTION BY IMPLEMENTING SPECIALIZED BLASTING, ANCHORING, AND GUNITE (SHOTCRETE) TECHNIQUES, CONTRIBUTING TO THE SAFE AND EFFECTIVE COMPLETION OF THE PROJECT.
AKTIO-LEFKADA ROAD
10
WE SUCCESSFULLY EXECUTED A HIGHLY TECHNICAL PROJECT, DREDGING 360,000M3 OF THE LAVRIO PORT BASIN. THE RESULT? A PORT WITH INCREASED CAPACITY AND IMPROVED INFRASTRUCTURE, READY TO ACCOMMODATE LARGER VESSELS AND FURTHER DEVELOP MARITIME ACTIVITIES.
LAVRIO, PORT
11
WE UNDERTOOK THE EXCAVATION WITH BLASTING FOR THE NEW UNIVERSITY GENERAL HOSPITAL OF ALEXANDROUPOLI. WE SHAPED THE FOUNDATION FOR A MODERN HOSPITAL THAT SERVES THE NEEDS OF THE COMMUNITY.
UNIVERSITY GENERAL HOSPITAL OF ALEXANDROUPOLIS
12
WE SUCCESSFULLY COMPLETED THE LARGEST PROJECT IN TERMS OF AREA, NEAR RESIDENTIAL AREAS, USING SPECIALIZED CONTROLLED BLASTING TECHNIQUES.